Power Precision
  • ×
  • Home
  • Online Store
  • Products
  • Services
  • Previous Work
  • Our Blog
  • About Us
  • 0
  • Power Precision
Contact Us
Latest
Substation Builder Powers Up For Expansion
Full article can be viewed on allnewbrunswick.com
 
  • Blogs:
  • All
  • Previous Work
  • News
HVDC Station Switchgear Improvements
Power Precision
HVDC Station Switchgear Improvements
Power Precision modernized switchgear and substation equipment at the New Brunswick HVDC Converter Station. The following improvements were made for the sake of safety and reliability: New 5 KV vacuum...
Aug 27, 2021 Previous Work
Wind Park Turbine Main Breaker Testing
Power Precision
Wind Park Turbine Main Breaker Testing
West Cape and Norway wind parks have 59 Wind turbines rated 3 MW each. Power Precision tested all 59 S and C Vista high voltage breakers during their 2 week outage including trip unit time current tes...
Aug 27, 2021 Previous Work
Electrical Distribution Infrared Analysis
Power Precision
Electrical Distribution Infrared Analysis
Power Precision's Certified Infrared Thermograph Technician investigate the following equipment: MCCs Switchgear Distribution Panels Capacitor Banks Transformers...
Aug 27, 2021 Previous Work
Hydro Plant Protection and Control Upgrade
Power Precision
Hydro Plant Protection and Control Upgrade
Our team completed the installation of new Grid Tie Protection and Control relays at 2 separate Hydro Generating Facilities. The new relay will detect unintentional islanding conditions when the trans...
Aug 27, 2021 Previous Work
Main Substation 138 kV Breaker and Protection Relay Upgrade
Power Precision
Main Substation 138 kV Breaker and Protection Relay Upgrade
Power Precision provided engineering, installation and commissioning services for improvement of the 138 KV outdoor substation at the Trevali Caribou Mines including replace OCB with 138 KV SF6 Breake...
Aug 27, 2021 Previous Work
Wind Park Substation and Commissioning
Power Precision
Wind Park Substation and Commissioning
Power Precision provided testing and commissioning services for the substation equipment at the Lameque Wind Park in Lameque, NB. Equipment included HV breakers, protection relays, cables, instrument ...
Aug 27, 2021 Previous Work
Sawmill 12 kV to 600 V Substation
Power Precision
Sawmill 12 kV to 600 V Substation
Power Precision worked with a local contractor to provide a new 12kV to 600V substation for the boiler at this lumber mill. A low arc flash solution was engineered and installed by Power Precision uti...
Aug 27, 2021 Previous Work
5kV Vacuum Breaker for DHP Switchgear
Power Precision
5kV Vacuum Breaker for DHP Switchgear
Two new vacuum breakers completed and being shipped to our customer. Replacement vacuum breakers from Power Precision are electrically operated with the following features and advantages: • Electrical...
Aug 26, 2021 Previous Work
Medium Voltage Fault Protection for Rail Industry
Power Precision
Medium Voltage Fault Protection for Rail Industry
...
Aug 18, 2021 Previous Work
Connecting Generators to the Grid for Savings
Power Precision
Connecting Generators to the Grid for Savings
More and more of our energy now comes from renewable sources. Variability of energy sources like wind energy creates additional challenges for electrical utilities to balance electricity supply and de...
Aug 17, 2021
  • Prev
  • 1
  • 2
  • Next
 
  • CONTACT INFO
    1780 Connolly Ave
  • Bathurst, New Brunswick, Canada
  • E2A 4W7
  • info@powerprecision.ca
        sales@powerprecision.ca
  • +1 (506) 548-1880
      +1 (844) 548-1880


     
Copyright © Power Precision
Powered by Odoo - The #1 Open Source eCommerce